| 題庫總數:10 | ||
| 是非題:5 (○:3、╳:2) | ||
| 選擇題:5 (A:1、B:2、C:1、D:1) | ||
| 多選題:0 | ||
| roddayeye整理,嚴禁抄襲 roddayeye.pixnet.net/blog | ||
| Q | r | Which of the following is NOT a major factor considered in risk assessment? |
| o | Pathogen transmission routes | |
| d | Infection dose | |
| v | d | Budget arrangements |
| a | Disease severity | |
| y | r.o.d.d.a.y.e.y.e. | |
| Q | e | The WHO Fourth Edition Manual mentions which method is most suitable for implementing biosafety? |
| y | Evidence-based contextual approach | |
| v | e | Standardized regulatory approach |
| . | Unstructured practical approach | |
| r | Random experience method | |
| o | r.o.d.d.a.y.e.y.e. | |
| Q | d | WHO recommends that laboratories use risk assessment as a way to achieve biosafety, rather than relying solely on fixed operating procedures. |
| v | d | ○ |
| a | ╳ | |
| y | r.o.d.d.a.y.e.y.e. | |
| Q | e | The results of a risk assessment do not affect whether personal protective equipment is purchased. |
| y | ○ | |
| v | e | ╳ |
| . | r.o.d.d.a.y.e.y.e. | |
| Q | r | As long as the laboratory design is perfect, there is no need to worry about the biosafety training level of laboratory personnel. |
| o | ○ | |
| v | d | ╳ |
| d | r.o.d.d.a.y.e.y.e. | |
| Q | a | The implementation of risk assessment requires systematization and standardization to ensure reproducibility and comparability. |
| v | y | ○ |
| e | ╳ | |
| y | r.o.d.d.a.y.e.y.e. | |
| Q | e | According to the manual, what does "P" represent in the PDCA cycle? |
| v | . | Plan |
| r | Do | |
| o | Check | |
| d | Act | |
| d | r.o.d.d.a.y.e.y.e. | |
| Q | a | Risk assessment's primary purpose is to support the development of risk control measures. |
| v | y | ○ |
| e | ╳ | |
| y | r.o.d.d.a.y.e.y.e. | |
| Q | e | Which of the following is NOT a classification of "possibility"? |
| . | Unlikely | |
| r | Almost certain (Highly probable) | |
| o | Possible | |
| v | d | Definitely |
| d | r.o.d.d.a.y.e.y.e. | |
| Q | a | According to the WHO Fourth Edition Manual, what is the main purpose of risk assessment? |
| y | Support risk control measures | |
| v | e | Evaluate budget expenditure |
| y | Ensure sample quality | |
| e | Reduce paperwork | |
| . | r.o.d.d.a.y.e.y.e. | |
| roddayeye整理,嚴禁抄襲 roddayeye.pixnet.net/blog |
文章標籤
全站熱搜
